This week, we had completed the water supply which include the piping and meter installation.
Penghuni Bangalo ini kian tambah
And for the Goat Barn Construction status, 3 Beams had completed and the iron works had started too with the erection of the main iron pole to support the roof-top.
This is the base structure for the Stage 1
(40' X 70').
Pandangan dari belakang.
Pembinaan Beam diteruskan.
On the other hand, jalan-jalan pun sudah di naik taraf
What happen to the Napier Grass?
Wah!, Siap sekali dengan tiang pagar.